Category A projects under consideration

Disclosure

 

Date of posting(dd/mm/yy) Country Project Name General description of project Project Sponsor Project Contact
10/19/2020 Canada Bloom Lake Phase II Expansion Phase II expansion of the Bloom Lake iron mine. Quebec Iron Ore Inc.

Michael Marcotte 

+1 514 316 4858 ext.128

mmarcotte@championironmines.com 

View the Environmental Impact Assessment

This site may contain, or provide links to, information from various third parties. EDC does not represent or endorse the accuracy or reliability of any such information and reliance thereupon shall also be at your own risk. EDC provides these links only as a convenience, and the inclusion of a link does not imply endorsement of the linked site by EDC. Neither EDC nor any of its agents or employees shall be liable for any reason to any user of this site for the information or links contained hereon or for any damages resulting there from.

Date of posting(dd/mm/yy)

Country Project Name General description of project Project Sponsor Project Contact
4/10/21 Dominican Republic

Guajimia Phase II, Stage I

Storm and sanitary drainage of the Guajimia Canal - Phase II, Stage I

Corporacion del Acueducto y Alcantarillado de Santo Domingo (CAASD)

Michael Cruz Gonzalez

809-562-3500 Ext. 1160 

michael.cruz@caasd.gob.do 

View the Environmental Impact Assessment

6/8/21 Mongolia Bayan Khundii Gold Project  Development and construction of an open pit gold mine and associated infrastructure. Erdene Resource Development Corporation

Jon Lyons

+976 11 319758

jlyons@erdene.com

View the Environmental Impact Assessment

This site may contain, or provide links to, information from various third parties. EDC does not represent or endorse the accuracy or reliability of any such information and reliance thereupon shall also be at your own risk. EDC provides these links only as a convenience, and the inclusion of a link does not imply endorsement of the linked site by EDC. Neither EDC nor any of its agents or employees shall be liable for any reason to any user of this site for the information or links contained hereon or for any damages resulting there from.

 

 

Date of posting(dd/mm/yy) Country Project Name General description of project Project Sponsor Project Contact
           
6/7/22 Canada Marathon Project Open pit copper and platinum group metals mine and associated infrastructure Generation Mining Limited

Ann Wilkinson

416-640-2954

awilkinson@genmining.com

The Environmental and Social Impact Assessment will be published when available from the project sponsor 

6/8/21 Mongolia Bayan Khundii Gold Project Development and construction of an open pit gold mine and associated infrastructure. Erdene Resource Development Corporation

Jon Lyons

+976 11 319758

jlyons@erdene.com

View the Environmental Impact Assessment

Date of posting(dd/mm/yy) Country Project Name General description of project Project Sponsor Project Contact
15/11/24 Germany Zero Carbon Lithium Project Engineering and construction of facilities for the extraction and production of battery grade lithium Vulcan Energy Resources Ltd. Samantha Langley
slangley@v-er.eu
View the Environmental Impact Assessment
8/11/24 Poland Baltyk III Offshore Wind Farm Design, development, construction, installation, testing, commissioning, operation and maintenance of an offshore wind project in the Baltic Sea Polenergia S.A. and Equinor Wind Power AS Marta Porzuczek
Marta.Porzuczek@polenergia.pl
View the Environmental Impact Assessment
8/11/24 Poland Baltyk II Offshore Wind Farm Design, development, construction, installation, testing, commissioning, operation and maintenance of an offshore wind project in the Baltic Sea Polenergia S.A. and Equinor Wind Power AS Marta Porzuczek
Marta.Porzuczek@polenergia.pl
View the Environmental Impact Assessment
4/08/23 Australia Mardie Salt & Potash Project  Development and construction of solar evaporation ponds, salt and potash production facilities and associated infrastructure. BCI Minerals Ltd. Kerryl Bradshaw 
Info@bciminerals.com.au
View the Environmental Impact Assessment
29/05/23 Australia Nolans Rare Earth Project Open pit rare earth mine and associated processing facilities Arafura Rare Earths Peter Sherrington
arafura@arultd.com
View the Environmental Impact Assessment
18/8/22 Canada Matawinie Mine and Bécancour Battery  Material Project Integrated open pit graphite mine and active anode materials plant and associated infrastructure. Nouveau Monde Graphite Inc. Éric Desaulniers
819-923-0333 
edesaulniers@nmg.com
View the Environmental Impact Assessment
6/7/22 Canada Marathon Project
Open pit copper and platinum group metals mine and associated infrastructure
Generation Mining Limited
Ann Wilkinson
416-640-2954
awilkinson@genmining.com
View the Environmental Impact Assessment


Project categorization may be subject to change, and if ultimately determined to be a Category B by EDC, the project under consideration will be removed from this page. This site may contain, or provide links to, information from various third parties. EDC does not represent or endorse the accuracy or reliability of any such information and reliance thereupon shall also be at your own risk. EDC provides these links only as a convenience, and the inclusion of a link does not imply endorsement of the linked site by EDC. Neither EDC nor any of its agents or employees shall be liable for any reason to any user of this site for the information or links contained hereon or for any damages resulting there from.

 

Date modified: 2024-11-15